·1 хв читання · 30 слів·👁 8.9K↗ 7
Yongnam’s JV partner terminates deed linked to S$553.8m LTA contract
The termination of the deed came as YEC was not in a position to pay S$1.5 million towards the JV.
The termination of the deed came as YEC was not in a position to pay S$1.5 million towards the JV.